Free construction estimate template
A clean estimate a client can read and sign: line items with quantities and prices, a subtotal, tax and total that calculate themselves in the spreadsheet, and room for the parts that prevent arguments later — what’s included, what isn’t, and how they’ll pay.
Free. No email, no account.
How to fill it out
1. Walk the job and write the scope
Before any numbers, write what you will do in the words the client used — “replace the tub surround with tile to the ceiling”, not a code. Note what is there now and what stays.
2. Measure and count
Take off quantities in units the client recognises: square feet of tile, linear feet of trim, each for fixtures, a lot for work that is one job. Measure twice — a quantity error is a price error.
3. Price each line at your cost, then add overhead and profit
Labour hours × your loaded rate, plus materials with waste. Then build in overhead and profit as a margin, not a simple add-on (see below) — and put the result in the unit price, so the client sees one number per line.
4. Say what is not included, and what is an allowance
Permits, client-supplied fixtures, work behind walls you cannot see: write it down. Where the client still has to choose a finish, price an allowance and say it is one.
5. Set the payment schedule and how long the price holds
A deposit to schedule, progress payments tied to milestones they can see, and a final payment. A “valid until” date protects you when material prices move.
6. Send it, then follow up
Send it while the visit is fresh, and follow up a few days later. Most estimates are lost to silence, not to a lower price.
A filled-in example: a small bathroom remodel
Example numbers to show the arithmetic — not prices for your area or your work.
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Demolition: remove tub surround, vanity and floor; haul away | 1 | lot | $850.00 | $850.00 |
| Plumbing: move vanity drain and supplies 18 in. | 1 | lot | $1,400.00 | $1,400.00 |
| Cement board and waterproofing, shower walls | 96 | sq ft | $6.50 | $624.00 |
| Porcelain wall tile, installed (tile allowance $5/sq ft) | 96 | sq ft | $18.00 | $1,728.00 |
| Floor tile, installed (tile allowance $4/sq ft) | 45 | sq ft | $16.00 | $720.00 |
| Install client-supplied vanity and faucet | 1 | each | $450.00 | $450.00 |
| Paint walls and ceiling | 1 | lot | $600.00 | $600.00 |
| Subtotal | $6,372.00 | |||
| Tax rate (%) | 6% | |||
| Tax | $382.32 | |||
| Total | $6,754.32 | |||
- Scope notes
- Tile the shower walls to the ceiling and the floor; move the vanity plumbing; paint.
- Not included
- Permit fees; vanity, faucet and fixtures (client-supplied); repairs to framing found behind walls.
- Payment schedule
- 30% to schedule · 40% when tile starts · 30% on completion.
Build overhead and profit into the price
Overhead and profit come out of the sale, so add them as a margin, not as a percentage on top of cost. The price that keeps them both is cost ÷ (1 − overhead % − profit %).
Adding 15% + 10% to a $1,000 cost
$1,250
keeps only a 20% margin — short by $83.
$1,000 ÷ (1 − 0.15 − 0.10)
$1,333
keeps the full 25% for overhead and profit.
Don’t know your overhead rate? Work it out with the free overhead calculator — it gives the markup to use.
What a good one includes
- Line items a client can follow
- Describe the work in the client’s words, one line per item, with a quantity, unit and price. A line they can read is a line they don’t call you about.
- What is not included
- Exclusions are the cheapest change-order prevention there is: permits, finish materials, haul-away, anything you’re assuming someone else handles.
- How long the price holds
- Material prices move. A “valid until” date turns an old quote into a conversation instead of a loss.
- How they’ll pay
- A deposit, progress payments and a final, written down before work starts.
- A place to sign
- A signature and date make it an agreement, not a suggestion.
What to add for your trade
- Remodeling
- Allowances for finishes the client hasn’t chosen, demolition and haul-away, protection of the rest of the house, and permits as their own line.
- Roofing
- Squares, layers to tear off, underlayment and ice barrier, flashing and vents, decking replaced per sheet if found rotten, and the dumpster.
- Electrical
- Devices and fixtures per opening, new circuits, panel work, and the permit and inspection.
- Concrete
- Cubic yards, forming, reinforcement, finish type, a pump or extra trips when access is tight, and the cure time before it can be used.
- Commercial and subcontract bids
- Price the bid form the way the documents ask — by spec section, with alternates and unit prices listed separately — and note the bond, insurance and retainage terms you assumed.
Or skip the paperwork
Draft it from a description or the drawings, priced at your rates, and send it as a link the client approves.
Questions
Is this template free?
Yes — the spreadsheet and the PDF are free to download and use, no email or account needed.
Does the spreadsheet calculate totals?
Yes. Each line multiplies quantity by unit price, and the subtotal, tax and total update as you type. Enter your tax rate as a percentage.
Is this a contract?
It’s a starting point, not legal advice. Contract requirements vary by state and by job — have your own terms reviewed for your work.
Does it work in Google Sheets?
Yes. Open Google Sheets → File → Import → Upload, and choose the file. The formulas carry over; so do they in Numbers and LibreOffice.
How do I add my markup?
Work out each line at your cost, then price it so overhead and profit come out of the sale: price = cost ÷ (1 − overhead % − profit %). With 15% overhead and 10% profit, a $1,000 line sells for about $1,333 — adding 25% to cost would only give $1,250. Put the result in the unit price.
What’s the difference between an estimate, a quote and a bid?
Used loosely they overlap. Usually an estimate is your best figure that may change if the scope does; a quote is a fixed price for a defined scope; a bid answers someone else’s plans and specs, often against other contractors. Say on the document which one it is.
Should the client see every line’s price?
Line items with quantities build trust and make changes easy to price. Some contractors show totals by area instead. Either way, keep your cost, overhead and profit inside the unit prices rather than as separate lines.